First LNG at Qatar’s North Field Expansion due late Q1 26 based on EA’s proprietary construction curves

May 19, 2025


Released last week for Energy Aspects subscribers, our latest Global LNG report on Qatar's North Field expansion projects uses our new proprietary construction curves and satellite imagery analysis. 


This exclusive report provides crucial insights into the revised timeline for North Field East (NFE) and North Field South (NFS) projects that will significantly impact global LNG supply balances. 


What you'll discover in this report:


  • The true commissioning timeline for Qatar's massive LNG expansion based on our exclusive satellite tracking methodology. 
  • How our proprietary construction curves reveal a different story from QatarEnergy's official statements. 
  • Why specific infrastructure components are creating critical bottlenecks in the development schedule. 
  • The quantifiable impact these timeline shifts will have on global LNG balances through 2028. 
This exclusive report provides crucial insights into the revised timeline for North Field East (NFE) and North Field South (NFS) projects that will significantly impact global LNG supply balances.

Download report

Please fill in your contact details to access the full insight.

Recent Posts

LNG Header
July 3, 2026
Iran's attacks on Hormuz vessels show why Qatar's LNG recovery will be slow. We explain what this means for Asian and European gas markets.
July 1, 2026
Clean product inventories are now at their lowest level since 2015. Global onshore crude stocks continue drawing nearly 4 mb/d.
Europe Gas Storage Header
June 25, 2026
EU gas storage stands 15 bcm below the five-year average. Our analysis explains why TTF prices need to stay elevated through summer.
Show More